Skip to main content
IRAN Energy News Agency
Oil, Gas, Petrochemical and Energy Field Specialized Channel
Oil, Gas, Petrochemical and Energy Field Specialized Channel
Oil, Gas, Petrochemical and Energy Field Specialized Channel

Gazprom Sends Rig from Black Sea to New Arctic Drill Site

Data from MarineTraffic shows that the Yang She You 278 now is in the Kola Bay on its way back from the operation.

 

The 6,570 ton heavy jackup rig spent 45 days on the voyage which was commanded by tugs from the Northern Shipping Company. Instrumental in the operation was Chinese heavy load vessel Hia Yang She You 278, News29 reports.

The rig was first transported to Sabetta, the new Arctic port on the northeastern tip of Yamal Peninsula and from there towed to the port of Yamburg on the eastern bank of the Ob Gulf.

The «Amazon» will reportedly spend the winter in Yamburg and next year engage in drilling in the area.

Data from MarineTraffic shows that the Yang She You 278 now is in the Kola Bay on its way back from the operation.

According to PortNews the «Amazon» is next year to drill a well in accordance with Gazprom’s development program.

It is not clear exactly which well will be drilled. But it could be the Kamennomysskoye-More, a structure located nearby in the Gulf of Ob. The field is located on very shallow waters and holds more than 550 billion cubic meters of natural gas.

News Code: 
10999

Categories

Join us on Telegram Channel."Energy Today"

Add new comment

CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
Fill in the blank.
Parvin Faghfouri Azar
Energy Today
w
+98.21.26413997
Unit 32, No. 26, North Naft Street
Tehran,TH,1918793572
Iran

Gazprom Sends Rig from Black Sea to New Arctic Drill Site

Data from MarineTraffic shows that the Yang She You 278 now is in the Kola Bay on its way back from the operation.
Parvin Faghfouri Azar
 The 6,570 ton heavy jackup rig spent 45 days on the voyage which was commanded by tugs from the Northern Shipping Company. Instrumental in the operation was Chinese heavy load vessel Hia Yang She You 278, News29 reports.The rig was first transported to Sabetta, the new Arctic port on the northeastern tip of Yamal Peninsula and from there towed to the port of Yamburg on the eastern bank of the Ob Gulf.The «Amazon» will reportedly spend the winter in Yamburg and next year engage in drilling in the area.Data from MarineTraffic shows that the Yang She You 278 now is in the Kola Bay on its way back from the operation.According to PortNews the «Amazon» is next year to drill a well in accordance with Gazprom’s development program.It is not clear exactly which well will be drilled. But it could be the Kamennomysskoye-More, a structure located nearby in the Gulf of Ob. The field is located on very shallow waters and holds more than 550 billion cubic meters of natural gas.
49